Ideal Log
Cart 0

 FREQUENTLY ASKED QUESTIONS

  • How much does it cost if i decide for a house?

    • Prices vary depending on the type of building, your preferences and what you choose from our range for products and construction:

      - Design

      - Initial preparation for the construction of the project ( excavation, embankment, concrete foundation or slab)

      - Thickness of timber or walls

      - Type of roof and windows

      - Distance from the job-site

      - Finishing works

  • How long does the construction of a building take?

    • A 60 square metre log cabin takes about 5-6 months to complete. It takes about 1-2 months to build a garage or a carport, garden shed or a children's play area. That is, if everything for the construction of the building has already been pre-arranged.

  • Why decide to build with wood?

    • Because wood is ecologically and environmentally friendly. This is to encourage building with Slovenian wood and to preserve the tradition of our ancestral buildings and handcrafting. Wood is an excellent insulator and, if properly manufactured and maintained, can have a lifespan of up to 200 years. Wood is 5x better insulator than brick and 15x better than concrete. Wood has been proven to have excellent earthquake-resistant structural properties, and can withstand up to level 9 on the Mercalli or EMS scale.

      It can also be perfectly combined with modern materials to modernise the building deisgn and bring it into the 21st century.

  • How is the wood protected from the elements?

    • It is protected with a special impregnation against insects, mould, and UV rays. After impregnation, you can also choose to protect it with different oils, paints or waxes.

  • How to get started?

    • Contact us by email or phone to make an appointment. Bring your plans, photos of the building you want to build, or we can design one for you and we'll work together to find the best possible solution for you. Once the relevant permits have been obtained and the order is confirmed, the contract is signed and the reservation amount of 10% of the invoice is paid. Before the actual start of construction the 1/3 of the amount is paid. During the actual construction of the building the 2/3 is paid and when the building is completed, the last 1/3 of the price is paid.

  • What do you need to build a house?

    • A building permit if you decide to build a house or a cottage.

    • A simple building permit if you decide to build a garage, carport or garden shed.

    • The best way to find out is to check with your local authority where the building will be located.


priroda-les-peizazh-gory-reka-lesa-derevia-eli.jpg